Constructed Worlds Wiki
Advertisement
     Orange Line
Info
Type Rapid transit
System RTS Koiwai
Locale Koiwai
Terminals Winter Park (northwest)
Edison Park (southwest, Phase V, 2010)
Industrial Center (south, current)
Stations 16 (current)
23 (Phase V)
Operation
Opened December 21, 2009
Operator(s) Koiwai Department of Transportation
Character Underground and elevated
Technical
Track gauge Standard Gauge
Electrification Third rail
Route map
uKBHFa
Winter Park KARRS logo
uBHF
Winter Park/Ancho
uBHF
Center for Advanced Studies
uINT
East Winter Park
uABZlf
Red Line
uINT
Takeda Downs         
uBHF
Manning
uBHF
Albertson
uBHF
Reliant Stadium
uINT
KDOT/Metro Center-Dalmasca     DKC logo
uBHF
Water CompanyDKC logo
uINT
Summerfield         DKC logo
uBHF
Windworks
uBHF
Thayter Park
uBHF
Shirley Park
uBHF
Industrial Center KARRS logo
uBHF
Galbadia
uBHF
Capital Power Company
uINT
Edison Boulevard     
uBHF
Kingsford
uINT
Sportscenter     
uABZlf
Green Line
uBHF
Shaley Farms
uBHF
Waterfront
uBHF
Calverton
uKBHFe
Landover


The Orange Line of the RTS Koiwai consists of 16 rapid transit stations from Winter Park to Industrial Center. It travels from Alero County to the City of Koiwai. This was the fourth line for which construction began and was completed on December 21, 2009. For the entirity of its route west of Takeda Downs station, it utilizes the Winter Park Rail Expressway, a series of high-speed express tracks shared with the Red Line, the KARRS Setsuna Line, and the Ivalice National Railways Diamond Coast services. Before entering Takeda Downs station, the Orange Line diverges with the Red Line, and joins the Green Line on the upper platform of Takeda Downs, and follows the Green Line for the remainder of its length.

Advertisement